Braintree Electric Light Department (BELD)

The mechanical scope included layout, balance of the plant piping, all balance of plant equipment skids and tanks as well as pre-commissioning services and startup support. Due to a completion duration of eight months it required detailed scheduling and careful coordination. In spite of the fast pace timetable and limited laydown area, Beacon Piping was able to commission the plant on time and permitted the town of Braintree to tie into the electrical grid and start making revenue.